DKJ Palomino Project Project A - Modifications and Renovation Of The Office Job Site: 427 N Avenida Caballeros Palm Springs CA –––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––– Scope Of Work As Of June 8, 2026, updated June 16, 2028, updated June 18, 2026 • Demolition Delete the existing cabinetry on the south wall of the loft Delete the north wall of the office Delete one section of cable-style railing to allow for new wall • New Construction Build two new walls to enlarge the office ( see blue lines ) Provide and install (1) set of french doors 48” x 84” solid core in wall as shown. Finish: Paint-grade/Glass: clear Match jamb, casing and hinges of existing doors Decorative hardware: Use existing from other existing doors Install new paint-grade base in space to match existing shape / profile Interior wall, ceiling and millwork paint by others Modify cable railing as needed end of loft. • Electrical Add wall outlets - shown as “new” Add two 120v floor outlets - shown as “new” Add one light can to match existing - shown as “new” –––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––– OFFICE BATHROOM / CLOSET( w/NEW LAUNDRY SPACE ) • Demolition Remove existing doors to the bath from office ( save existing hardware ) Remove existing door to the closet ( save existing hardware )
New Construction
Reframe entry to bathroom for an in-swing entry to bath Provide and install 36” wide x 90” tall solid core door Finish: Paint-grade Match jamb, casing and hinges of existing doors Decorative hardware: Use existing Plumb the closet for a stack washer and dryer Install a drain pan for washer and drain line to exterior if practical Reframe entry to closet to be 36” wide by 90” tall / with jambs Provide and install a slab style barn door and sliding door rail to the closet 42” x 96” Cabinetry for closet laundry - by others Interior wall, ceiling and millwork paint - by others
Electrical
Add 120v GFCI for washer - shown as new Add 220v for self-venting dryer - shown as new Add 120v wall outlet on common wall between closet and hallway - shown as new Make allowance for replacement of light sconces in bath Move switch connected to existing can light as needed to avoid sliding barn door.
Paint and Wallcovering Schedule
DKJ - Palomino Project Interior Finish Schedule as of June 6, 2026, updated June 15, 2026
F I R S TF L O O R Main Entry Hall + Staircase Prep and paint walls, ceilings, base and millwork Ceiling: SW 7757 Reflective White - flat finish Walls: SW 7634 Pediment - eggshell finish Base: SW 7551 Greek Villa - Semigloss Doors: SW 7551 Greek Villa - Semigloss
Great Room, Dining and Kitchen and Pantry Closet Areas Prep and paint walls, ceiling, base and millwork Ceiling: SW 7757 Reflective White - flat finish Walls: SW 7634 Pediment - eggshell finish Base: SW 7551 Greek Villa - Semigloss Doors: SW 7551 Greek Villa - Semigloss Note: Remove existing grass paper from walls
Lounge Prep and paint ceiling, base and millwork Ceiling: SW 7757 Reflective White - flat finish Walls: Wallcoverings by others Base: SW 7551 Greek Villa - Semigloss Doors: SW 7551 Greek Villa - Semigloss
Lounge Bathroom Prep and paint ceiling, base and millwork Ceiling: SW 7757 Reflective White - flat finish Walls: Wallcoverings by others Base: SW 7551 Greek Villa - Semigloss Doors: SW 7551 Greek Villa - Semigloss Powder Bathroom Ceiling: SW 7757 Reflective White - flat finish Walls: Wallcoverings by others Base: SW 7551 Greek Villa - Semigloss Doors: SW 7551 Greek Villa - Semigloss Laundry Room Prep and paint walls, ceilings, base and millwork Ceiling: SW 7757 Reflective White - flat finish Walls: SW 7634 Pediment - eggshell finish Base: SW 7551 Greek Villa - Semigloss Doors: SW 7551 Greek Villa - Semigloss
S E C O N DF L O O R Main Hallway Prep and paint walls, ceilings, base and millwork Ceiling: SW 7757 Reflective White - flat finish Walls: SW 7634 Pediment - eggshell finish Base: SW 7551 Greek Villa - Semigloss Doors: SW 7551 Greek Villa - Semigloss
Office Prep and paint walls, ceilings, base and millwork Ceiling: SW 7757 Reflective White - flat finish Walls: SW 7634 Pediment - eggshell finish Base: SW 7551 Greek Villa - Semigloss Doors: SW 7551 Greek Villa - Semigloss
Office Bathroom and Laundry Closet Ceiling: SW 7757 Reflective White - flat finish Walls: Wallcoverings by others Base: SW 7551 Greek Villa - Semigloss Doors: SW 7551 Greek Villa - Semigloss
Primary Bedroom Prep and paint walls, ceiling, base and millwork Ceiling: SW 7757 Reflective White - flat finish Walls: SW 7634 Pediment - eggshell finish Base: SW 7551 Greek Villa - Semigloss Doors: SW 7551 Greek Villa - Semigloss Note: Remove existing paper from north wall
Primary Closet Prep and paint walls, ceiling, base and millwork Ceiling: SW 7757 Reflective White - flat finish Walls: SW 7634 Pediment - eggshell finish Base: SW 7551 Greek Villa - Semigloss Doors: SW 7551 Greek Villa - Semigloss
Primary Bathroom + Toilet Room
Ceiling: SW 7757 Reflective White - flat finish Walls: Wallcoverings by others Base: SW 7551 Greek Villa - Semigloss Doors: SW 7551 Greek Villa - Semigloss
C A S I T A
Great Room Ceiling: SW 7757 Reflective White - flat finish Walls: SW 7634 Pediment - eggshell finish Base: SW 7551 Greek Villa - Semigloss Doors: SW 7551 Greek Villa - Semigloss
Bedroom Ceiling: SW 7757 Reflective White - flat finish Walls: Wallcoverings by others Base: SW 7551 Greek Villa - Semigloss Doors: SW 7551 Greek Villa - Semigloss