The Design Collective Group, Inc.
  • Welcome Home
  • Who .
    • Contact Us.
  • In My Humble Opinion
  • What .
  • When .
  • Where .
  • Why .
  • How .
  • Portfolio .
    • Living Spaces
    • Kitchen Spaces
    • Bedroom Spaces
    • Bathroom Spaces
    • Club Design
    • Office Design
    • Other Spaces
    • Recents Spaces
  • Get This Guide
  • Providence Project
  • Condo Project
  • S+J-PSP
  • La Quinta Project
  • R+J - Rancho Mirage
  • An Artful Home Project
  • Testimonials + Awards
  • Client Access
  • mitchscott
  • Project Portfolio
  • thompsonhardesty
  • Alta-PSP
  • Phillips
  • Bella Cara Way Residence
  • SilverSands
  • johnstevecabana
  • DunnCapitalFinal
  • NickCash-PSP
  • 3D Renderings
  • Makie Residence
  • Sun City Palm Desert
  • 67 Canejo Circle Residence
  • Citrus Renovation
  • WardGade
  • M Bathroom @ Citrus Country Club
  • TrilogyCMCDesignConcepts
  • PCA-Interior Finishes
  • Ledesma Residence
  • DKJ-MonteSereno
  • AM-PSP
  • Olivier MBath
  • Ritchie Great Room
  • DKJ-PSP
  • DKJ-DEN
  • ORPS-PreliminaryConcepts
  • ORPS-La Palma Revisions v1.5a
  • NC Amado v3
  • Hermosa PSP

Welcome Home

Project Overview 

As Of: June 18, 2026, updated June 20, 2026 
FIRST FLOOR
Picture
Great Room Elements
Option A                                                                                                      Option B 
Option Panel A: Light Translucent Grey Carrera Marble                    Option Panel B: Light Translucent Onyx Panel
Lounge Elements
White Crock Counter Tops                                                                       Solid Surface Floating Counter w/Waterfall Edge  
Picture
Typical Tufted Sofa
Picture

SECOND FLOOR
Picture
DKJ Office 
Looking Into The Laundry Closet From Bath                                    Looking Into The Closet From The Bathroom Vanity 

DKJ Palomino Project
Project A - Modifications and Renovation Of The Office 

Job Site: 427 N Avenida Caballeros
​Palm Springs CA                              
––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––
Scope Of Work
As Of June 8, 2026, updated June 16, 2028, updated June 18, 2026
        • Demolition
Delete the existing cabinetry on the south wall of the loft
Delete the north wall of the office
Delete one section of cable-style railing to allow for new wall
         • New Construction
Build two new walls to enlarge the office ( see blue lines )
Provide and install (1) set of french doors 48” x 84” solid core in wall as shown.
Finish: Paint-grade  /  Glass: clear
Match jamb, casing and hinges of existing doors
Decorative hardware: Use existing from other existing doors   
Install new paint-grade base in space to match existing shape / profile
Interior wall, ceiling and millwork paint by others
Modify cable railing as needed end of loft.
         • Electrical
Add wall outlets - shown as “new”
Add two 120v floor outlets - shown as “new”
Add one light can to match existing - shown as “new”
––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––
OFFICE BATHROOM / CLOSET  ( w/NEW LAUNDRY SPACE )
        •    Demolition
Remove existing doors to the bath from office ( save existing hardware )
Remove existing door to the closet ( save existing hardware )
  • New Construction
Reframe entry to bathroom for an in-swing entry to bath
Provide and install 36” wide x 90” tall solid core door
Finish: Paint-grade
Match jamb, casing and hinges of existing doors
Decorative hardware: Use existing
Plumb the closet for a stack washer and dryer
Install a drain pan for washer and drain line to exterior if practical
Reframe entry to closet to be 36” wide by 90” tall / with jambs
Provide and install a slab style barn door and sliding door rail to the closet 42” x 96”
Cabinetry for closet laundry - by others
Interior wall, ceiling and millwork paint - by others
  • Electrical
Add 120v GFCI for washer - shown as new
Add 220v for self-venting dryer - shown as new
Add 120v wall outlet on common wall between closet and hallway - shown as new
Make allowance for replacement of light sconces in bath
Move switch connected to existing can light as needed to avoid sliding barn door.


Paint and Wallcovering Schedule 

DKJ - Palomino Project
Interior Finish Schedule
as of June 6, 2026, updated June 15, 2026


F I R S T    F L O O R
Main Entry Hall + Staircase
Prep and paint walls, ceilings, base and millwork
        Ceiling:      SW 7757 Reflective White - flat finish
        Walls:         SW 7634 Pediment - eggshell finish
        Base:           SW 7551 Greek Villa - Semigloss
        Doors:        SW 7551 Greek Villa - Semigloss

Great Room, Dining and Kitchen and Pantry Closet Areas
Prep and paint walls, ceiling, base and millwork
        Ceiling:      SW 7757 Reflective White - flat finish
        Walls:         SW 7634 Pediment - eggshell finish
        Base:           SW 7551 Greek Villa - Semigloss
        Doors:        SW 7551 Greek Villa - Semigloss
        Note: Remove existing grass paper from walls

Lounge
Prep and paint ceiling, base and millwork
        Ceiling:      SW 7757 Reflective White - flat finish
        Walls:        Wallcoverings by others
        Base:          SW 7551 Greek Villa - Semigloss
        Doors:        SW 7551 Greek Villa - Semigloss

Lounge Bathroom
Prep and paint ceiling, base and millwork
        Ceiling:      SW 7757 Reflective White - flat finish
        Walls:         Wallcoverings by others
        Base:          SW 7551 Greek Villa - Semigloss
        Doors:        SW 7551 Greek Villa - Semigloss
Powder Bathroom
        Ceiling:      SW 7757 Reflective White - flat finish
        Walls:        Wallcoverings by others
        Base:          SW 7551 Greek Villa - Semigloss
        Doors:        SW 7551 Greek Villa - Semigloss
Laundry Room
        Prep and paint walls, ceilings, base and millwork
        Ceiling:      SW 7757 Reflective White - flat finish
        Walls:         SW 7634 Pediment - eggshell finish
        Base:          SW 7551 Greek Villa - Semigloss
        Doors:        SW 7551 Greek Villa - Semigloss

S E C O N D    F L O O R
Main Hallway
Prep and paint walls, ceilings, base and millwork
        Ceiling:      SW 7757 Reflective White - flat finish
        Walls:         SW 7634 Pediment - eggshell finish
        Base:          SW 7551 Greek Villa - Semigloss
        Doors:        SW 7551 Greek Villa - Semigloss

Office
Prep and paint walls, ceilings, base and millwork
        Ceiling:      SW 7757 Reflective White - flat finish
        Walls:         SW 7634 Pediment - eggshell finish
        Base:          SW 7551 Greek Villa - Semigloss
        Doors:        SW 7551 Greek Villa - Semigloss

Office Bathroom and Laundry Closet
        Ceiling:      SW 7757 Reflective White - flat finish
        Walls:        Wallcoverings by others
        Base:          SW 7551 Greek Villa - Semigloss
        Doors:        SW 7551 Greek Villa - Semigloss

Primary Bedroom
Prep and paint walls, ceiling, base and millwork
        Ceiling:      SW 7757 Reflective White - flat finish
        Walls:         SW 7634 Pediment - eggshell finish
        Base:           SW 7551 Greek Villa - Semigloss
        Doors:        SW 7551 Greek Villa - Semigloss  
        Note: Remove existing paper from north wall

Primary Closet
Prep and paint walls, ceiling, base and millwork
        Ceiling:      SW 7757 Reflective White - flat finish
        Walls:         SW 7634 Pediment - eggshell finish
        Base:         SW 7551 Greek Villa - Semigloss
        Doors:        SW 7551 Greek Villa - Semigloss

Primary Bathroom + Toilet Room

        Ceiling:     SW 7757 Reflective White - flat finish
        Walls:        Wallcoverings by others
        Base:         SW 7551 Greek Villa - Semigloss
        Doors:        SW 7551 Greek Villa - Semigloss

C A S I T A

Great Room
        Ceiling:      SW 7757 Reflective White - flat finish
        Walls:         SW 7634 Pediment - eggshell finish
        Base:          SW 7551 Greek Villa - Semigloss
        Doors:        SW 7551 Greek Villa - Semigloss

Bedroom
        Ceiling:      SW 7757 Reflective White - flat finish
        Walls:        Wallcoverings by others
        Base:          SW 7551 Greek Villa - Semigloss
        Doors:        SW 7551 Greek Villa - Semigloss

Bathroom
        Ceiling:      SW 7757 Reflective White - flat finish
        Walls:        Wallcoverings by others
        Base:          SW 7551 Greek Villa - Semigloss
        Doors:        SW 7551 Greek Villa - Semigloss

©1996 ~ 2025 The Design Collective Group, Inc. • All Rights Reserved •
​Voice: 760 - 322 - 3784  
 All Photos, Images + Text Are Copyrighted + Cannot Be Used Without First Obtaining Permission.  -- 2025.
  • Welcome Home
  • Who .
    • Contact Us.
  • In My Humble Opinion
  • What .
  • When .
  • Where .
  • Why .
  • How .
  • Portfolio .
    • Living Spaces
    • Kitchen Spaces
    • Bedroom Spaces
    • Bathroom Spaces
    • Club Design
    • Office Design
    • Other Spaces
    • Recents Spaces
  • Get This Guide
  • Providence Project
  • Condo Project
  • S+J-PSP
  • La Quinta Project
  • R+J - Rancho Mirage
  • An Artful Home Project
  • Testimonials + Awards
  • Client Access
  • mitchscott
  • Project Portfolio
  • thompsonhardesty
  • Alta-PSP
  • Phillips
  • Bella Cara Way Residence
  • SilverSands
  • johnstevecabana
  • DunnCapitalFinal
  • NickCash-PSP
  • 3D Renderings
  • Makie Residence
  • Sun City Palm Desert
  • 67 Canejo Circle Residence
  • Citrus Renovation
  • WardGade
  • M Bathroom @ Citrus Country Club
  • TrilogyCMCDesignConcepts
  • PCA-Interior Finishes
  • Ledesma Residence
  • DKJ-MonteSereno
  • AM-PSP
  • Olivier MBath
  • Ritchie Great Room
  • DKJ-PSP
  • DKJ-DEN
  • ORPS-PreliminaryConcepts
  • ORPS-La Palma Revisions v1.5a
  • NC Amado v3
  • Hermosa PSP