The Design Collective Group, Inc.
  • Welcome Home
  • Who .
    • Contact Us.
  • In My Humble Opinion
  • What .
  • When .
  • Where .
  • Why .
  • How .
  • Portfolio .
    • Living Spaces
    • Kitchen Spaces
    • Bedroom Spaces
    • Bathroom Spaces
    • Club Design
    • Office Design
    • Other Spaces
    • Recents Spaces
  • Get This Guide
  • Providence Project
  • Condo Project
  • S+J-PSP
  • La Quinta Project
  • R+J - Rancho Mirage
  • An Artful Home Project
  • Testimonials + Awards
  • Client Access
  • mitchscott
  • Project Portfolio
  • thompsonhardesty
  • Alta-PSP
  • Phillips
  • Bella Cara Way Residence
  • SilverSands
  • johnstevecabana
  • DunnCapitalFinal
  • NickCash-PSP
  • 3D Renderings
  • Makie Residence
  • Sun City Palm Desert
  • 67 Canejo Circle Residence
  • Citrus Renovation
  • WardGade
  • M Bathroom @ Citrus Country Club
  • TrilogyCMCDesignConcepts
  • PCA-Interior Finishes
  • Ledesma Residence
  • DKJ-MonteSereno
  • AM-PSP
  • Olivier MBath
  • Ritchie Great Room
  • DKJ-PSP
  • DKJ-DEN
  • ORPS-PreliminaryConcepts
  • ORPS-La Palma Revisions v1.5a
  • NC Amado v3
  • Hermosa PSP

Chaparral Countryclub
Clubhouse
​PHASE  TWO DESIGN CONCEPT v2       (c) 2025

Phase Two:
Renovations and Additional Updates for the CC Clubhouse

v.1.0 December 2, 2024, Updated: January 4, 2025, Updated: January 16, 2025, Updated: January 22, 2025, Updated: February 4, 2025, Updated Feb 13, 2025

Main Project Objectives:
√ Review The Bar Area + Develop Solutions For Better Seating Arrangements
√ Create Additional Work Spaces For The CCC Administration Offices 
for New HR Manager + Activities Director
√ Make Initial Recommendations To Front Facade Of CCC Building To Update The Appearance

​• Note: For Added Context, Please Reference CCC Scope Of Work / Phase One for details and information
             Colors reflect the color direction and not actual finishes
             Designs reflected here are conceptual ideas only and do not reflect final design elements nor decisions. 
• Clubhouse Floor Plan 
Picture

Clubhouse Bar 

√ Updated Floor Plan Features 12 Bar Stools At An Extended Bar at NorthEast Corner 
√ Plan Creates Banquette Seating Along South Wall
√ Total Seating for 60 Using Existing Dining Tables
√ New Facade For Fireplace 
​√ Create Wider Door Openings Between Bar and Dining Room  
PictureNew Floor Plan Of Bar
 

Picture
Perspective Looking Northeast Toward Bar and Built-In Seating
Picture
Area Of New Extended Bar
Picture
View Towards New Bar Extension ON THE LEFT AND Across Windows
Picture
View From Fireplace Toward Bar and Exterior

• Provide Additional Seating Options With Built-In Banquette On South Wall
Picture
Highlighted Area Shows Location Of Banquette Seating
Picture
Banquette Seating, Tables and Chairs

• New Facade to Existing Fireplace With Porcelain Limestone Tile and Accents Of Wood Trims
Picture
Location of Fireplace Wall
Picture
Remove Existing Faux Ledger Stone and Install Tile and Wood Trims
Picture
New Fireplace Facade With Tile and Wood Details
Picture
View of Side Of Fireplace From Entry
Picture
Looking Toward Fireplace From Dining Room

• Opening Doorways Between Bar and Dining Room
Picture
Highlighted Areas Indicate Location Of New Folding Doors
Picture
New Folding Glass Panel Doors at Entry Between Bar and Dining Room
Picture
Doors Folded Back Between Bar and Dining Room
Picture
View of New Doors Installed In Wall Between Dining Room and Bar
Projected Finishes For Cabinetry, Walls, Counters, Chairs... 
Picture
Picture
Picture
Picture
Picture
Picture
Picture
Picture
Picture
High Resolution Image Of New Bar Design

• Administration Offices
√ Build 3/4 Walls In Main Office Area To Create Two Individual Offices
√ Add Tall Wall Cabinets In Hall For Additional Paper and File Storage
√ Build Passage Hall In Existing Storage Room To Create New HR Office

√ Build Wall Inside Library to Create New Storage Room Off Of Passage Hall 
Picture
Picture
View Toward New Arrangement Of Offices
Picture
New Tall Wall Cabinets For Storage
Picture
View Towards New Office
Picture
Looking Into New HR Office

• Front Facade Of Clubhouse
E X I S T I N G    F A C A D E
Picture

N E W    U P D A T E D   F A C A D E  IN  A  CONTEMPORARY MISSION AESTHETIC 
​√ Recommended Updates Include Painting Selected Walls, Trims, Beams and Outriggers
√ Renovate Gardens And Edit Out Old Plantings to Open Views Toward Building
√ Add Lighting To Enhance Evening Arrival Experience 
​√ Create New Face To Motorized Gate
Picture
√  Large Planters w/Desert Plantings At Entry Steps
√ Install Large Pendant Light At Entry
√ Apply Moldings To Main Entry Doors, Windows
 
Picture

Suggested Paint Colors
Picture
Main Exterior Color
Picture
Color For Beams, Trims, Outriggers
Picture
Accent Color For Pots, Metal Gate
©1996 ~ 2025 The Design Collective Group, Inc. • All Rights Reserved •
​Voice: 760 - 322 - 3784  
 All Photos, Images + Text Are Copyrighted + Cannot Be Used Without First Obtaining Permission.  -- 2025.
  • Welcome Home
  • Who .
    • Contact Us.
  • In My Humble Opinion
  • What .
  • When .
  • Where .
  • Why .
  • How .
  • Portfolio .
    • Living Spaces
    • Kitchen Spaces
    • Bedroom Spaces
    • Bathroom Spaces
    • Club Design
    • Office Design
    • Other Spaces
    • Recents Spaces
  • Get This Guide
  • Providence Project
  • Condo Project
  • S+J-PSP
  • La Quinta Project
  • R+J - Rancho Mirage
  • An Artful Home Project
  • Testimonials + Awards
  • Client Access
  • mitchscott
  • Project Portfolio
  • thompsonhardesty
  • Alta-PSP
  • Phillips
  • Bella Cara Way Residence
  • SilverSands
  • johnstevecabana
  • DunnCapitalFinal
  • NickCash-PSP
  • 3D Renderings
  • Makie Residence
  • Sun City Palm Desert
  • 67 Canejo Circle Residence
  • Citrus Renovation
  • WardGade
  • M Bathroom @ Citrus Country Club
  • TrilogyCMCDesignConcepts
  • PCA-Interior Finishes
  • Ledesma Residence
  • DKJ-MonteSereno
  • AM-PSP
  • Olivier MBath
  • Ritchie Great Room
  • DKJ-PSP
  • DKJ-DEN
  • ORPS-PreliminaryConcepts
  • ORPS-La Palma Revisions v1.5a
  • NC Amado v3
  • Hermosa PSP